stuart geary
New member
- Joined
- Aug 30, 2006
- Messages
- 0
- Reaction score
- 0
Hi, I wonder if anyone could help me. Ive recently bought a maver 13.5 m pole with 2 power top 2s
Ive been fitting 2 different size elastics into the top 2 ends with a bung that you can wind up to tension.
The problem i have is when packing the 2 section (telescopic) down into 1 length again for storage and travel. As the sections are the same length, the top section then pushes out the bung when i reduce the pole down, and it comes out of the end. Is this correct? Should i be doing it this way. The shop owner said i have the corect size bung winder but it goes in a little too far ( 1 foot) before holding. Even if this was shorter, the first section would still push it out when collapsing the pole. Any advice would be appreciated
Ive been fitting 2 different size elastics into the top 2 ends with a bung that you can wind up to tension.
The problem i have is when packing the 2 section (telescopic) down into 1 length again for storage and travel. As the sections are the same length, the top section then pushes out the bung when i reduce the pole down, and it comes out of the end. Is this correct? Should i be doing it this way. The shop owner said i have the corect size bung winder but it goes in a little too far ( 1 foot) before holding. Even if this was shorter, the first section would still push it out when collapsing the pole. Any advice would be appreciated